Seven services, one crew, one point of contact. Flatwork is the backbone of the business — the landscape gets designed around it instead of fighting it for the same six inches of soil.
Concrete first. Then everything around it.
01
Concrete patios & walkways
Stamped, integrally coloured and sealed. River Rock, Grand Slate and Olde English slate skin are mats we own, so you pick the finish and we run it. Borders, bands and relief cuts get laid out on paper before a truck is ordered.
River RockGrand SlateOlde EnglishBroom & borderDriveways
02
Steps
Poured steps, landings and stoops, stamped to match the walk they land on. Treads get a slate skin or a broom finish so they still have grip in February, and risers carry the same colour as the field.
Front stoopsLandingsStamped risersRebuilds
03
Custom concrete countertops
Cast, ground and polished to the edge profile you choose. Integral colour all the way through, sink and drainboard formed in, and a food-safe sealer. Kitchens, islands, bar tops, vanities and outdoor kitchens.
Planting plans built from what actually thrives in Zone 6a, with beds shaped to the house, amended soil, and grading that moves water away from the foundation.
Fall: leaves off the lawn and out of the beds, perennials cut back, edges re-cut, everything hauled. Spring: winter debris cleared, beds re-edged and re-mulched, first cut and a fertiliser round to start the season clean.
Mowing on a set day, beds weeded, shrubs pruned in the right season instead of whenever we happen to be there, mulch topped up, seasonal colour swapped. Same crew every visit, so nobody has to be told twice.
Segmental block and natural stone, plus the seat walls, steps and fire pits that go with them. Drainage stone, filter fabric and a daylighted drain behind every wall — the parts nobody photographs and everybody regrets skipping.
Drag the slab to turn it. Every mat on this page is one we own and every colour is on the Color-Crete chart we order from — bring a screenshot to the estimate and we'll price that exact finish.
Turn the slab. Find your finish.
Drag to rotate
Stamp mat
Integral colour Increte Color-Crete
Border course
Accent & sealer
Stamp
River Rock
Colour
Sandstone CC730
Border
No border
Sealer
Matte cure & seal
Colours are approximations of the Color-Crete chart. Actual colour shifts with slump, finishing, weather and the sand in the mix — ask for a job-site sample before you commit.
Rochester is USDA Zone 6a — roughly −10°F in a hard winter, with lake-effect snow piled on the beds until April. Everything below is chosen to come back.
A planting plan is a drainage plan with flowers on top.
Most failed landscapes in Monroe County aren't a plant problem — they're a grade problem, a soil problem, or a salt problem. We fix the ground first, then plant into it, then edge it so it still looks installed in year three.
Grade before green
We shoot elevations and move water away from the foundation before a single plant goes in — a minimum quarter-inch per foot for the first ten feet, swales or a French drain where the lot won't cooperate.
Soil you can dig with your hand
Monroe County clay gets broken with compost and coarse sand to a full spade depth across the whole bed, not just the planting hole. A hole amended inside heavy clay becomes a bathtub.
Bed section
What a bed looks like the day after we leave, in section. The two dimensions that matter most are 3″ of mulch and the root flare sitting at grade.
Landscape lighting
12-volt LED on solid brass and copper fixtures, buried at 6″ in conduit under anything we pour. Transformer sized with 20% headroom, astronomic timer plus photocell.
Half the year, it's dark when you get home.
In Rochester the sun is down before five from November to February. Lighting isn't a garnish on the landscape — for four months it is the landscape. Switch the layers on and off below.
A segmental wall is a drainage structure that happens to hold soil. Everything that makes it last is behind the block, where nobody will ever see it.
The part of the wall you pay for is the part you can't see.
Walls fail from water pressure and frost, not from weight. Drainage stone, filter fabric, a daylighted drain and a buried base course are the whole difference between a wall at year twenty and a wall bellied out at year four.
Winter spec
Rochester sits in USDA Zone 6a. Between November and April a slab here crosses 32°F and back roughly seventy times. Water in the pores expands nine percent every single time.
The concrete doesn't fail in July.
Scaling, spalling and pop-outs are freeze-thaw damage, and they're specified out before the truck ever shows up — with entrained air, a lower water-cement ratio, a base that drains, and a sealer schedule that doesn't stop after year one.
Illustrative — typical Rochester winter, from NWS normals for Monroe County.
6%
Entrained air
Microscopic bubbles give freezing water somewhere to expand. Without them, it expands into the slab.
0.45
Max water–cement ratio
A wetter, easier-to-finish pour is a weaker, more porous one. We hold the ratio and work harder.
2×
Compacted in lifts
Base depth is set by what we find when we dig — clay and poor drainage get more. However deep it goes, it goes in in lifts and gets plate-compacted, never dumped and raked.
3yr
Reseal interval
We come back and reseal on schedule. Stamped concrete that gets sealed outlives the mortgage.
How a job runs
A typical 900 sq ft stamped driveway runs four to six working days on site, weather permitting, plus cure time before you drive on it.
Seven steps, in this order, every time.
01
Walk the site
We measure, shoot grades, find where water currently goes, and mark utilities. You get a fixed written number, not a range that moves later.
Day 0 No charge
02
Layout & demo
Existing slab out, string lines set, excavation to subgrade. Old concrete gets hauled to a recycler, not dumped in the yard.
Day 1 Excavate to subgrade
03
Base & compaction
Base stone goes in in lifts and gets plate-compacted on each pass, to a depth set by the soil on your property. This is the step that decides whether the driveway is flat in ten years.
Day 1–2 Depth set on site
04
Forms & steel
Forms staked to grade with real pitch for drainage, fiber mesh or rebar mat set on chairs so the steel sits in the slab, not under it.
Day 2 ¼″ per ft pitch
05
Pour, stamp, release
Colored mix placed, screeded, floated, then stamped at the right window — too early it smears, too late it won't take. Antiquing release goes on with the mats.
Day 3 4,000 PSI · 6% air
06
Cut, wash, seal
Relief cuts sawn where the slab wants to move — re-entrant corners, long runs, anywhere it will want to crack — within 24 hours. Release washed off, first coat of cure-and-seal once the slab is dry.
Day 4–5 Cut within 24 hr
07
Landscape & restore
Beds shaped, plants set, edging and mulch in, lawn repaired where the machines ran. We leave the site cleaner than the day we found it.
Day 5–6 Then 7 days cure
Finish library
Rendered swatches of the mats we own — not photographs of jobs. Ask to see the real portfolio and references when we walk your site.
The mats in the trailer.
The whole wall, rendered in one colour so you can read the pattern rather than the tint. Pick two you're deciding between, then take them into the selector above and try colours on them.
Service area
Based in Rochester, working Monroe County and the northern Finger Lakes. Outside this list? Call anyway — we travel for the right job.
Square footage, rough timing, and a photo if you have one. We'll walk the site, take grades, and send a written number — usually within three business days.